Skip to content
Media Library Rec

Watch the Work Behind Reliable Power.

Footage from live project sites and our production floor in Giza — generator installations, acoustic enclosures and the engineering details that go into every job.

  • 04Project videos
  • 10Factory clips
  • GizaEgypt
Badr Station — Egypt–Saudi Electrical Interconnection
When Silence Works
Ayady Hospital — Standby Power Installation
LiveCam 01

Now showing · Project

Badr Station

Scroll

01Project Videos

From Drawings to Running Sites.

Short films from installations we have delivered — the scope we carried, where it happened, and the equipment involved, as published on our official channels.

Badr, EgyptDec 13, 2025

Badr Station — Egypt–Saudi Electrical Interconnection

United contributed to generator installation and associated acoustic and diesel fuel-system works at Badr Station, executed to approved drawings.

United’s scope

  • Generator installation
  • Acoustic enclosure works
  • Air inlet & outlet openings
  • Filters
  • Diesel fuel-feed system

Spec2,250 kVA generator installation referenced in the published update

Alexandria, EgyptVideo library

Ayady Hospital — Standby Power Installation

A 500 kVA generator supply and installation with an acoustic enclosure, plus associated fuel, exhaust and cabling works, designed for coastal conditions.

  • 500 kVA generator
  • Acoustic enclosure
  • Fuel, exhaust & cabling

Field operationsNov 27, 2025

United Means Emergency Response

A short field clip on how our technical team steps in on site when standby power needs attention.

  • Technical support
  • After-sales

Project sitesDec 21, 2025

Performance, Installation & Quality

Nine seconds on what United stands for on every job: performance, careful installation and quality.

  • Installation
  • Quality

Project details reflect United’s published project updates. Full specifications are confirmed per project with our technical team.

02Factory Videos

Inside the Floor Where It’s Built.

Our acoustic enclosures and fabricated components are made locally in Giza. Pick any clip from the reel below to put it on the main screen.

When Silence Works

The Factory Reel 10 clips · drag or scroll

  • Acoustic Enclosures

    When Silence Works

    Dec 24, 2025

  • Production Floor

    Enclosure Line — Short Cut

    Dec 24, 2025

  • Production Floor

    Workshop Footage — Extended Reel

    Aug 25, 2025

  • Production Floor

    Workshop Footage — Short Reel

    Aug 25, 2025

  • Production Floor

    Production Update

    Sep 1, 2025

  • Production Floor

    Production Floor — Clip 01

    Jul 28, 2025

  • Production Floor

    Production Floor — Clip 02

    Jul 28, 2025

  • Production Floor

    Production Floor — Clip 03

    Jul 28, 2025

  • Fabrication Bay

    Fabrication Bay — Clip 01

    Jul 26, 2025

  • Fabrication Bay

    Fabrication Bay — Clip 02

    Jul 26, 2025

Scroll to Top